Lewis Run - Pierce Brook 230 kV (A01-589)
Lewis Run - Pierce Brook 230 kV is a 170.0 MW battery interconnection project in Mckean, Pennsylvania with a current status of withdrawn. It is proposed to connect at Lewis Run - Pierce Brook 230 kV.
170.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology
Project facts
| Canonical name | Lewis Run - Pierce Brook 230 kV |
|---|---|
| Queue ID | A01-589 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Battery |
| Capacity | 170.0 MW |
| State | Pennsylvania |
| County | Mckean |
| Point of interconnection | Lewis Run - Pierce Brook 230 kV |
| Requested (queue) date | 2025-09-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | RWE Solar Development, LLC |
| Utility / transmission owner | PJM |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata