PJM — Interconnection Queue Projects
PJM is associated with 16 tracked interconnection projects representing 1,089 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
16Projects
0Active
0Operational
16Withdrawn
1,089 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 13 | 879 MW |
| Battery | 3 | 210 MW |
Portfolio by market
| Market | Projects |
|---|---|
| NYISO | 16 |
Geographic footprint
| State | Projects |
|---|---|
| Pennsylvania | 16 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Lewis Run - Pierce Brook 230 kV | A01-588 | Solar | 240.0 MW | withdrawn | Mckean, Pennsylvania |
| Farmers Valley – Ridgeway 115 kV | A01-587 | Solar | 200.0 MW | withdrawn | Mckean, Pennsylvania |
| Lewis Run - Pierce Brook 230 kV | A01-589 | Battery | 170.0 MW | withdrawn | Mckean, Pennsylvania |
| Seward-Glory 115 kV | A01-102 | Solar | 100.0 MW | withdrawn | Indiana, Pennsylvania |
| Pierce Brook-Lewis Run 230 kV | A01-456 | Solar | 80.0 MW | withdrawn | Mckean, Pennsylvania |
| Pierce Brook - Lewis Run 230 kV | A01-457 | Solar | 80.0 MW | withdrawn | Mckean, Pennsylvania |
| Tennessee Gas-East Towanda 115 kV | A01-206 | Solar | 48.0 MW | withdrawn | Bradford, Pennsylvania |
| East Towanda-South Troy 115 kV | A01-220 | Solar | 31.0 MW | withdrawn | Bradford, Pennsylvania |
| East Towanda-South Troy 115 kV II | A01-005 | Solar | 20.0 MW | withdrawn | Bradford, Pennsylvania |
| Pierce Brook - Lewis Run 230 kV | A01-360 | Battery | 20.0 MW | withdrawn | Mckean, Pennsylvania |
| Pierce Brook - Lewis Run 230 kV | A01-359 | Solar | 20.0 MW | withdrawn | Mckean, Pennsylvania |
| South Troy - North Towanda 34.5 kV | A01-221 | Solar | 20.0 MW | withdrawn | Bradford, Pennsylvania |
| Pierce Brook-Lewis Run 230kV | A01-357 | Solar | 20.0 MW | withdrawn | Mckean, Pennsylvania |
| Pierce Brook-Lewis Run 230kV | A01-358 | Battery | 20.0 MW | withdrawn | Mckean, Pennsylvania |
| Tennessee Gas-East Towanda 115 kV | A01-327 | Solar | 10.0 MW | withdrawn | Bradford, Pennsylvania |
| Oxbow 34.5 kV | A01-439 | Solar | 9.8 MW | withdrawn | Wyoming, Pennsylvania |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through PJM.
Start tracking with interXdata