Lexington-Dooms 230 kV (AG1-421 - moved to TC1)

Lexington-Dooms 230 kV is a 200.0 MW solar interconnection project in Augusta, Virginia with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLexington-Dooms 230 kV
Queue IDAG1-421 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateVirginia
CountyAugusta
Point of interconnection
Requested (queue) date2020-09-30
Proposed in-service date2023-12-29
Operational date
Withdrawn date2024-06-24
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.