Liberty Senate Energy Storage 1 (23INR0334)

Liberty Senate Energy Storage 1 is a 207.4 MW other interconnection project in Jack, Texas with a current status of operational. It is proposed to connect at 1445 Burwick 345kV.

207.4 MWCapacity
OperationalStatus
JackMarket
OtherTechnology

Project facts

Canonical nameLiberty Senate Energy Storage 1
Queue ID23INR0334
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJack
TechnologyOther
Capacity207.4 MW
StateTexas
CountyJack
Point of interconnection1445 Burwick 345kV
Requested (queue) date2021-10-05
Proposed in-service date
Operational date2027-10-27
Withdrawn date
DeveloperSenate Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata