LITTLE LAKE SOUTH WIND FARM (244)

LITTLE LAKE SOUTH WIND FARM is a 120.0 MW wind interconnection project in Kern/inyo, California with a current status of withdrawn. It is proposed to connect at Control-Haiwee-Inyokern 115kV line.

120.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLITTLE LAKE SOUTH WIND FARM
Queue ID244
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity120.0 MW
StateCalifornia
CountyKern/inyo
Point of interconnectionControl-Haiwee-Inyokern 115kV line
Requested (queue) date2007-07-16
Proposed in-service date
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata