Livingston - Rich 138kV (J1963)

Livingston - Rich 138kV is a 25.0 MW battery interconnection project in Polk, Texas with a current status of withdrawn. It is proposed to connect at Livingston - Rich 138kV.

25.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLivingston - Rich 138kV
Queue IDJ1963
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity25.0 MW
StateTexas
CountyPolk
Point of interconnectionLivingston - Rich 138kV
Requested (queue) date2021-11-29
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2023-10-25
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata