Polk County, Texas — Interconnection Projects
The interXdata warehouse tracks 10 interconnection projects in Polk, Texas, representing 957 MW of requested capacity.
10Total projects
1Active
5Operational
4Withdrawn
957 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 905 MW |
| Other | 3 | 27 MW |
| Battery | 1 | 25 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SHECO/ETEC, BUS#334130 | J3985 | Solar | 240.0 MW | withdrawn | Polk, Texas |
| 138kV Bragg - SHECO Menard Line | J2754 | Solar | 170.0 MW | operational | Polk, Texas |
| Segno Solar Station | 69991_SN1 | Solar | 170.0 MW | active | Polk, Texas |
| Umbriel Solar | 66954_23001 | Solar | 150.0 MW | operational | Polk, Texas |
| SHECO | J2242 | Solar | 100.0 MW | withdrawn | Polk, Texas |
| Livingston - Rich 138kV | J1962 | Solar | 75.0 MW | withdrawn | Polk, Texas |
| Livingston - Rich 138kV | J1963 | Battery | 25.0 MW | withdrawn | Polk, Texas |
| RC Thomas Hydroelectric Project | 58645_RCT2 | Other | 8.9 MW | operational | Polk, Texas |
| RC Thomas Hydroelectric Project | 58645_RCT1 | Other | 8.9 MW | operational | Polk, Texas |
| RC Thomas Hydroelectric Project | 58645_RCT3 | Other | 8.9 MW | operational | Polk, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Polk County.
Start tracking with interXdata