Loma Pinta II (19INR0166)

Loma Pinta II is a 201.6 MW wind interconnection project in La Salle, Texas with a current status of withdrawn. It is proposed to connect at 5705 Fowlerton 138kV.

201.6 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameLoma Pinta II
Queue ID19INR0166
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity201.6 MW
StateTexas
CountyLa Salle
Point of interconnection5705 Fowlerton 138kV
Requested (queue) date2018-02-27
Proposed in-service date2021-12-15
Operational date
Withdrawn date2020-09-08
DeveloperEnerverse
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata