Lone Pine 115 kV is a 15.0 MW solar interconnection project in Nottoway, Virginia with a current status of withdrawn.

15.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLone Pine 115 kV
Queue IDAG1-167 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity15.0 MW
StateVirginia
CountyNottoway
Point of interconnection
Requested (queue) date2020-09-16
Proposed in-service date2021-10-15
Operational date
Withdrawn date2025-11-03
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata