LONE STAR INDUSTRIAL PARK GAS POWER PROJECT (27INR0324)

LONE STAR INDUSTRIAL PARK GAS POWER PROJECT is a 166.0 MW gas interconnection project in Morris, Texas with a current status of operational. It is proposed to connect at 1795 Monticello SES 138kV.

166.0 MWCapacity
OperationalStatus
MorrisMarket
GasTechnology

Project facts

Canonical nameLONE STAR INDUSTRIAL PARK GAS POWER PROJECT
Queue ID27INR0324
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMorris
TechnologyGas
Capacity166.0 MW
StateTexas
CountyMorris
Point of interconnection1795 Monticello SES 138kV
Requested (queue) date2024-09-04
Proposed in-service date
Operational date2028-05-11
Withdrawn date
DeveloperLONE STAR INDUSTRIAL PARK, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata