Morris County, Texas — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Morris, Texas, representing 2,281 MW of requested capacity.

5Total projects
3Active
2Operational
0Withdrawn
2,281 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas31,066 MW
Other1915 MW
Solar1300 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Welsh-Lydia 345kV LineGEN-2023-204Other914.6 MWactiveMorris, Texas
Naples Power Plant68273_2Gas450.0 MWactiveMorris, Texas
Naples Power Plant68273_1Gas450.0 MWactiveMorris, Texas
Lydia - Welsh 345 kV LineGEN-2024-068Solar300.0 MWoperationalMorris, Texas
LONE STAR INDUSTRIAL PARK GAS POWER PROJECT27INR0324Gas166.0 MWoperationalMorris, Texas

Top developers

Developer (canonical)ProjectsCapacity
LONE STAR INDUSTRIAL PARK, LLC1166 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.