Lone Tiger Solar is a 242.8 MW solar interconnection project in Jones, Texas with a current status of active. It is proposed to connect at Tap 345 kV Claytonville (#68001) to phantom hill (#68004) .
242.8 MWCapacity
ActiveStatus
JonesMarket
SolarTechnology
Project facts
| Canonical name | Lone Tiger Solar |
|---|---|
| Queue ID | 29INR0393 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Jones |
| Technology | Solar |
| Capacity | 242.8 MW |
| State | Texas |
| County | Jones |
| Point of interconnection | Tap 345 kV Claytonville (#68001) to phantom hill (#68004) |
| Requested (queue) date | 2026-09-18 |
| Proposed in-service date | 2029-10-06 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Origis Development LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata