Long Beach Convention Center (63615_LBCON)

Long Beach Convention Center is a 1.5 MW battery interconnection project in Los Angeles, California with a current status of operational.

1.5 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameLong Beach Convention Center
Queue ID63615_LBCON
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity1.5 MW
StateCalifornia
CountyLos Angeles
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2019-04-01
Withdrawn date
Developer
Utility / transmission ownerHybrid-Electric Building Technologies West Los Angeles 1, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.