Hybrid-Electric Building Technologies West Los Angeles 1, LLC — Interconnection Queue Projects

Hybrid-Electric Building Technologies West Los Angeles 1, LLC is associated with 9 tracked interconnection projects representing 17 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

9Projects
0Active
9Operational
0Withdrawn
17 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery917 MW

Geographic footprint

StateProjects
California9

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
OCSD63616_OCSD1Battery4.9 MWoperationalOrange, California
CSU Long Beach63611_CSULBBattery2.5 MWoperationalLos Angeles, California
Downey63613_DOWNYBattery2.0 MWoperationalLos Angeles, California
Allergan63609_ALRGNBattery1.5 MWoperationalOrange, California
Long Beach Convention Center63615_LBCONBattery1.5 MWoperationalLos Angeles, California
SOCCD63617_SOCCDBattery1.3 MWoperationalOrange, California
Baker63610_BAKERBattery1.2 MWoperationalOrange, California
LAWRP63614_LAWRPBattery1.0 MWoperationalOrange, California
DATS63612_DATS0Battery1.0 MWoperationalOrange, California

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Hybrid-Electric Building Technologies West Los Angeles 1, LLC.

Start tracking with interXdata