Long Point Solar (19INR0042)

Long Point Solar is a 120.7 MW solar+battery interconnection project in Brazoria, Texas with a current status of active. It is proposed to connect at 138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02.

120.7 MWCapacity
ActiveStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameLong Point Solar
Queue ID19INR0042
Statusactive
Source statusactive
MarketERCOT
TechnologySolar+Battery
Capacity120.7 MW
StateTexas
CountyBrazoria
Point of interconnection138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02
Requested (queue) date2017-03-15
Proposed in-service date2026-04-07
Operational date
Withdrawn date
DeveloperLong Point Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata