LOTUS SOLAR FARM (723)

LOTUS SOLAR FARM is a 50.0 MW solar interconnection project in Madera, California with a current status of operational. It is proposed to connect at Borden 70kV.

50.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameLOTUS SOLAR FARM
Queue ID723
Statusoperational
Source statusCOMPLETED
Market
TechnologySolar
Capacity50.0 MW
StateCalifornia
CountyMadera
Point of interconnectionBorden 70kV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.