Madera County, California — Interconnection Projects
The interXdata warehouse tracks 341 interconnection projects in Madera, California, representing 3,249 MW of requested capacity.
341Total projects
4Active
315Operational
20Withdrawn
3,249 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar+Battery | 7 | 902 MW |
| Battery | 8 | 845 MW |
| Solar | 289 | 683 MW |
| Gas | 21 | 493 MW |
| Other | 15 | 326 MW |
| Wind | 1 | 0 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Galadriel | 2297 | Battery | 317.5 MW | active | Madera, California |
| MADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1) | 579 | Solar | 220.0 MW | withdrawn | Madera, California |
| MADERA ENERGY CENTER | 196 | Gas | 210.0 MW | withdrawn | Madera, California |
| PUMA STORAGE | 1933 | Battery | 200.0 MW | withdrawn | Madera, California |
| LOTUS SOLAR 2 | 1934 | Solar+Battery | 200.0 MW | active | Madera, California |
| TRIGO | 1567 | Solar+Battery | 150.0 MW | withdrawn | Madera, California |
| FLORES STORAGE | 1953 | Battery | 150.0 MW | withdrawn | Madera, California |
| IRRIGOSA | 1577 | Solar+Battery | 150.0 MW | withdrawn | Madera, California |
| LOWLANDS P3 | 44 | Gas | 126.5 MW | withdrawn | Madera, California |
| LOTUS 2 SOLAR FARM | 1384 | Solar+Battery | 102.0 MW | withdrawn | Madera, California |
| WADY SOLAR | 1250 | Solar | 102.0 MW | withdrawn | Madera, California |
| FERRY HYBRID SOLAR | 1716 | Solar+Battery | 100.0 MW | withdrawn | Madera, California |
| HENSLEY HYBRID SOLAR | 1719 | Solar+Battery | 100.0 MW | withdrawn | Madera, California |
| FOXGLOVE HYBRID SOLAR | 1717 | Solar+Battery | 100.0 MW | withdrawn | Madera, California |
| Mammoth Pool | 344_2 | Other | 95.0 MW | operational | Madera, California |
| Mammoth Pool | 344_1 | Other | 95.0 MW | operational | Madera, California |
| RIVIERA SOLAR | 1584 | Solar | 75.0 MW | withdrawn | Madera, California |
| VALETUDO ENERGY STORAGE | 1977 | Battery | 75.0 MW | withdrawn | Madera, California |
| MADERA ENERGY CENTER EXPANSION | 247 | Gas | 67.0 MW | withdrawn | Madera, California |
| MADERA SOLAR | 821 | Solar | 60.0 MW | withdrawn | Madera, California |
| HOBBS ENERGY STORAGE | 1233 | Battery | 50.5 MW | withdrawn | Madera, California |
| Big Creek 4 | 320_2 | Other | 50.0 MW | operational | Madera, California |
| KINGSTON ENERGY STORAGE | 1481 | Battery | 50.0 MW | withdrawn | Madera, California |
| Big Creek 4 | 320_1 | Other | 50.0 MW | operational | Madera, California |
| Borden Solar Farm | 59531_BRDN | Solar | 50.0 MW | operational | Madera, California |
| LOTUS SOLAR FARM | 723 | Solar | 50.0 MW | operational | Madera, California |
| MADERA POWER | 282 | Gas | 29.0 MW | withdrawn | Madera, California |
| Adera Solar | 60027_ADERA | Solar | 20.0 MW | operational | Madera, California |
| CHOWCHILLA SOLAR PROJECT | 644 | Solar | 20.0 MW | operational | Madera, California |
| BIO VERDE PV - VLOT | 597 | Solar | 15.0 MW | withdrawn | Madera, California |
| Ardagh Solar | 68427_1 | Solar | 12.9 MW | operational | Madera, California |
| Ampersand Chowchilla Biomass LLC | 56706_AMPC | Other | 12.5 MW | suspended | Madera, California |
| CHOWCHILLA BIOMASS | 75 | Gas | 10.5 MW | operational | Madera, California |
| KDC Solar Madera LLC | 68038_VSPRC | Solar | 10.0 MW | operational | Madera, California |
| Wonderful Firebaugh | 66331_WFB01 | Solar | 5.4 MW | operational | Madera, California |
| Costa View Farms | 67835_64544 | Solar | 5.0 MW | operational | Madera, California |
| Wonderful Orchards - New Columbia | 64055_WOC | Solar | 5.0 MW | operational | Madera, California |
| Avenue 26 Solar | 66809_A26P2 | Solar | 5.0 MW | operational | Madera, California |
| PG&E DG PGE-INT-112056254 | PGE-INT-112056254 | Solar | 4.5 MW | operational | Madera, California |
| Pacific Ethanol Madera Solar Array | 61989_PV | Solar | 4.3 MW | operational | Madera, California |
| San Joaquin 3 | 277_3 | Other | 4.0 MW | suspended | Madera, California |
| A G Wishon | 293_3 | Other | 3.2 MW | operational | Madera, California |
| A G Wishon | 293_2 | Other | 3.2 MW | operational | Madera, California |
| A G Wishon | 293_4 | Other | 3.2 MW | operational | Madera, California |
| A G Wishon | 293_1 | Other | 3.2 MW | operational | Madera, California |
| Chowchilla II | 56185_IC7 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC6 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC8 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC11 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC4 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC2 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC10 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC15 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC14 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC1 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC13 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC9 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC5 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC12 | Gas | 3.1 MW | operational | Madera, California |
| Chowchilla II | 56185_IC16 | Gas | 3.1 MW | operational | Madera, California |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Unlimited Energy | 41 | 0 MW |
| Offline | 34 | 0 MW |
| Solahart All Valley | 21 | 0 MW |
| REC Solar, Inc. | 19 | 0 MW |
| Akeena Solar | 13 | 0 MW |
| Sharpe Solar Energy Systems, Inc. | 13 | 0 MW |
| Regrid Power, Inc. | 13 | 0 MW |
| Solar City | 12 | 0 MW |
| Renewable Energy Concepts, Inc. | 12 | 0 MW |
| Power Independence Electric | 11 | 0 MW |
| Acro Electric | 7 | 0 MW |
| Energy Efficiency Solar, Inc. dba ACRO Energy Inc. | 6 | 0 MW |
| Nova West Solar | 4 | 0 MW |
| Hi-Tech Solar | 4 | 0 MW |
| Arise Solar | 3 | 0 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ca-dgstats; California ISO — public interconnection queue; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Madera County.
Start tracking with interXdata