Lucy Solar (25INR0225)

Lucy Solar is a 352.2 MW solar interconnection project in Concho, Texas with a current status of operational. It is proposed to connect at Tap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos Creek - 76009 Twin Buttes.

352.2 MWCapacity
OperationalStatus
ConchoMarket
SolarTechnology

Project facts

Canonical nameLucy Solar
Queue ID25INR0225
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketConcho
TechnologySolar
Capacity352.2 MW
StateTexas
CountyConcho
Point of interconnectionTap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos Creek - 76009 Twin Buttes
Requested (queue) date2023-06-28
Proposed in-service date
Operational date2027-06-30
Withdrawn date
DeveloperConcho Pearl Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata