Lumen Farm Solar SLF (23INR0439)

Lumen Farm Solar SLF is a 201.0 MW solar interconnection project in Anderson, Texas with a current status of operational. It is proposed to connect at Tap 138kV 3325 Blackburn Switch – 3272 Palestine .

201.0 MWCapacity
OperationalStatus
AndersonMarket
SolarTechnology

Project facts

Canonical nameLumen Farm Solar SLF
Queue ID23INR0439
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAnderson
TechnologySolar
Capacity201.0 MW
StateTexas
CountyAnderson
Point of interconnectionTap 138kV 3325 Blackburn Switch – 3272 Palestine
Requested (queue) date2022-01-06
Proposed in-service date
Operational date2028-09-30
Withdrawn date
DeveloperNeches Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata