Anderson County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Anderson, Texas, representing 5,175 MW of requested capacity.

11Total projects
3Active
7Operational
1Withdrawn
5,175 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas44,143 MW
Other4518 MW
Solar2338 MW
Battery1176 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Mule Deer Run Gas III31INR0022Gas1,380.0 MWactiveAnderson, Texas
Mule Deer Run Gas II31INR0021Gas1,300.0 MWactiveAnderson, Texas
Mule Deer Run Gas32INR0003Gas1,263.0 MWoperationalAnderson, Texas
ALWEST BESS22INR0541Other208.6 MWoperationalAnderson, Texas
Lumen Farm Solar SLF23INR0439Solar201.0 MWoperationalAnderson, Texas
Alwest20INR0125Gas200.0 MWwithdrawnAnderson, Texas
Brotherton Storage25INR0432Other176.1 MWoperationalAnderson, Texas
Brotherton Storage68165_BROBABattery176.1 MWactiveAnderson, Texas
Skull Creek Solar23INR0289Solar137.0 MWoperationalAnderson, Texas
Pham BESS28INR0094Other133.0 MWoperationalAnderson, Texas
Lumen Farm BESS SLF24INR0450Other0.0 MWoperationalAnderson, Texas

Top developers

Developer (canonical)ProjectsCapacity
Anderson Energy Center, LLC33,943 MW
Neches Solar, LLC2201 MW
Skull Creek Solar, LLC1137 MW
BT Brotherton Storage, LLC1176 MW
Castleman Power1209 MW
ASB1, LLC1133 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.