Luthor Solar (25INR0106)

Luthor Solar is a 101.0 MW solar interconnection project in Howard, Texas with a current status of operational. It is proposed to connect at Tap 138kV 23831 Luther Station – 10032 Little Luther .

101.0 MWCapacity
OperationalStatus
HowardMarket
SolarTechnology

Project facts

Canonical nameLuthor Solar
Queue ID25INR0106
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHoward
TechnologySolar
Capacity101.0 MW
StateTexas
CountyHoward
Point of interconnectionTap 138kV 23831 Luther Station – 10032 Little Luther
Requested (queue) date2022-06-27
Proposed in-service date
Operational date2027-09-25
Withdrawn date
DeveloperTREX US Luthor LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.