Lutum Wind (20INR0029)

Lutum Wind is a 241.5 MW other interconnection project in Clay, Texas with a current status of operational. It is proposed to connect at tap 345kV 6101 Riley - 1730 W Krum.

241.5 MWCapacity
OperationalStatus
ClayMarket
OtherTechnology

Project facts

Canonical nameLutum Wind
Queue ID20INR0029
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketClay
TechnologyOther
Capacity241.5 MW
StateTexas
CountyClay
Point of interconnectiontap 345kV 6101 Riley - 1730 W Krum
Requested (queue) date2017-09-12
Proposed in-service date
Operational date2027-07-01
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata