Clay County, Texas — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Clay, Texas, representing 3,163 MW of requested capacity.

9Total projects
1Active
6Operational
2Withdrawn
3,163 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar31,505 MW
Other31,052 MW
Wind2304 MW
Battery1302 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Hiru Solar23INR0228Solar603.7 MWoperationalClay, Texas
Hiru Storage24INR0444Other503.6 MWoperationalClay, Texas
Soleil Solar25INR0097Solar451.7 MWoperationalClay, Texas
Soleil67664_SOLEISolar450.0 MWactiveClay, Texas
Clay County Yang Storage26INR0612Other307.3 MWoperationalClay, Texas
Soleil Storage25INR0098Battery301.6 MWwithdrawnClay, Texas
Lutum Wind20INR0029Other241.5 MWoperationalClay, Texas
Shannon Wind59034_SHAN1Wind204.0 MWoperationalClay, Texas
Bluegrove Wind18INR0044Wind100.0 MWwithdrawnClay, Texas

Top developers

Developer (canonical)ProjectsCapacity
Soleil Solar, LLC2753 MW
Hecate Energy21,107 MW
DM-CCY, LLC1307 MW
RWE Solar Development, LLC1242 MW
Innergex1100 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Clay County.

Start tracking with interXdata