Lydia - Welsh 345 kV Line (GEN-2024-068)

Lydia - Welsh 345 kV Line is a 300.0 MW solar interconnection project in Morris, Texas with a current status of operational. It is proposed to connect at Lydia - Welsh 345 kV Line.

300.0 MWCapacity
OperationalStatus
TXMarket
SolarTechnology

Project facts

Canonical nameLydia - Welsh 345 kV Line
Queue IDGEN-2024-068
Statusoperational
Source statusDISIS STAGE
MarketTX
TechnologySolar
Capacity300.0 MW
StateTexas
CountyMorris
Point of interconnectionLydia - Welsh 345 kV Line
Requested (queue) date2024-10-30
Proposed in-service date
Operational date2028-10-02
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata