Lyon County - Cedar Mountain 345 kV Circuit 2 Line (J1106)

Lyon County - Cedar Mountain 345 kV Circuit 2 Line is a 414.0 MW wind interconnection project in Redwood County, Minnesota with a current status of withdrawn. It is proposed to connect at Lyon County - Cedar Mountain 345 kV Circuit 2 Line.

414.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLyon County - Cedar Mountain 345 kV Circuit 2 Line
Queue IDJ1106
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity414.0 MW
StateMinnesota
CountyRedwood County
Point of interconnectionLyon County - Cedar Mountain 345 kV Circuit 2 Line
Requested (queue) date2018-03-12
Proposed in-service date2021-08-01
Operational date2021-08-01
Withdrawn date2021-03-09
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata