Mackeys 230 kV (AF1-236)

Mackeys 230 kV is a 1,210.0 MW solar interconnection project in Tyrell, North Carolina with a current status of withdrawn.

1,210.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMackeys 230 kV
Queue IDAF1-236
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity1,210.0 MW
StateNorth Carolina
CountyTyrell
Point of interconnection—
Requested (queue) date2019-09-27
Proposed in-service date2024-09-30
Operational date—
Withdrawn date2022-08-19
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.