MADERA SOLAR (821)

MADERA SOLAR is a 60.0 MW solar interconnection project in Madera, California with a current status of withdrawn. It is proposed to connect at Borden Sub 70 KV Bus.

60.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMADERA SOLAR
Queue ID821
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity60.0 MW
StateCalifornia
CountyMadera
Point of interconnectionBorden Sub 70 KV Bus
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-03-29
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata