MADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1) (579)

MADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1) is a 220.0 MW solar interconnection project in Madera, California with a current status of withdrawn. It is proposed to connect at Borden Sub 230kV bus.

220.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMADERA SOLAR PV I (FKA WHEELER RIDGE SOLAR PV1)
Queue ID579
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity220.0 MW
StateCalifornia
CountyMadera
Point of interconnectionBorden Sub 230kV bus
Requested (queue) date2010-02-01
Proposed in-service date
Operational date
Withdrawn date2011-02-15
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata