Maderagemela BESS1 is a 154.0 MW other interconnection project in Waller, Texas with a current status of operational. It is proposed to connect at Tap 138kV 44750 FULSHR_S25_8 to 44860 TWINWD_S25_8.

154.0 MWCapacity
OperationalStatus
WallerMarket
OtherTechnology

Project facts

Canonical nameMaderagemela BESS1
Queue ID26INR0426
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketWaller
TechnologyOther
Capacity154.0 MW
StateTexas
CountyWaller
Point of interconnectionTap 138kV 44750 FULSHR_S25_8 to 44860 TWINWD_S25_8
Requested (queue) date2024-02-27
Proposed in-service date—
Operational date2029-02-01
Withdrawn date—
DeveloperTwinwood ES1, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30operational_date2027-10-272029-02-01medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.