Waller County, Texas — Interconnection Projects
The interXdata warehouse tracks 11 interconnection projects in Waller, Texas, representing 2,855 MW of requested capacity.
11Total projects
0Active
8Operational
3Withdrawn
2,855 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 1,423 MW |
| Other | 5 | 1,173 MW |
| Battery | 1 | 260 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Ochoa Energy Storage II | 27INR0235 | Other | 516.6 MW | operational | Waller, Texas |
| Parliament Solar | 23INR0044 | Solar | 484.6 MW | operational | Waller, Texas |
| Twinwood Solar 1 | 26INR0425 | Solar | 358.1 MW | operational | Waller, Texas |
| Ochoa Energy Storage | 26INR0114 | Battery | 260.2 MW | withdrawn | Waller, Texas |
| Parliament Solar | 69320_PAR1 | Solar | 241.0 MW | operational | Waller, Texas |
| Parliament Solar | 69320_PAR2 | Solar | 239.0 MW | operational | Waller, Texas |
| Caladium BESS | 26INR0243 | Other | 201.3 MW | operational | Waller, Texas |
| Augie BESS | 24INR0461 | Other | 200.8 MW | operational | Waller, Texas |
| Maderagemela BESS1 | 26INR0426 | Other | 154.0 MW | operational | Waller, Texas |
| Juggernaut | 20INR0277 | Other | 100.0 MW | withdrawn | Waller, Texas |
| Monaville Solar | 21INR0252 | Solar | 100.0 MW | withdrawn | Waller, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Caladium Storage, LLC | 1 | 201 MW |
| Parliament Solar, LLC | 1 | 485 MW |
| BRP Blue Topaz 2, LLC | 1 | 201 MW |
| Twinwood PV1, LLC | 1 | 358 MW |
| Twinwood ES1, LLC | 1 | 154 MW |
| Energy Efficiency Solar, Inc. dba ACRO Energy Inc. | 1 | 100 MW |
| Ochoa Energy Storage II LLC | 1 | 517 MW |
| Monaville Solar LLC | 1 | 100 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Waller County.