Waller County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Waller, Texas, representing 2,855 MW of requested capacity.

11Total projects
0Active
8Operational
3Withdrawn
2,855 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar51,423 MW
Other51,173 MW
Battery1260 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Ochoa Energy Storage II27INR0235Other516.6 MWoperationalWaller, Texas
Parliament Solar23INR0044Solar484.6 MWoperationalWaller, Texas
Twinwood Solar 126INR0425Solar358.1 MWoperationalWaller, Texas
Ochoa Energy Storage26INR0114Battery260.2 MWwithdrawnWaller, Texas
Parliament Solar69320_PAR1Solar241.0 MWoperationalWaller, Texas
Parliament Solar69320_PAR2Solar239.0 MWoperationalWaller, Texas
Caladium BESS26INR0243Other201.3 MWoperationalWaller, Texas
Augie BESS24INR0461Other200.8 MWoperationalWaller, Texas
Maderagemela BESS126INR0426Other154.0 MWoperationalWaller, Texas
Juggernaut20INR0277Other100.0 MWwithdrawnWaller, Texas
Monaville Solar21INR0252Solar100.0 MWwithdrawnWaller, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Waller County.

Start tracking with interXdata