Madisonburg Jct-Millheim 46 kV (AG1-258)

Madisonburg Jct-Millheim 46 kV is a 19.9 MW solar interconnection project in Centre, Pennsylvania with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMadisonburg Jct-Millheim 46 kV
Queue IDAG1-258
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity19.9 MW
StatePennsylvania
CountyCentre
Point of interconnection
Requested (queue) date2020-09-28
Proposed in-service date2023-08-01
Operational date
Withdrawn date2021-02-25
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata