Marick Rose BESS (25INR0487)
Marick Rose BESS is a 50.2 MW battery interconnection project in Fort Bend, Texas with a current status of active. It is proposed to connect at Tap 138kV 44521 Marick - 44615 Rosenberg Ckt 60.
50.2 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Marick Rose BESS |
|---|---|
| Queue ID | 25INR0487 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 50.2 MW |
| State | Texas |
| County | Fort Bend |
| Point of interconnection | Tap 138kV 44521 Marick - 44615 Rosenberg Ckt 60 |
| Requested (queue) date | 2023-07-10 |
| Proposed in-service date | 2026-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Marick BESS |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata