Martinsburg (V2-002)

Martinsburg is a 2.6 MW gas interconnection project in Blair, Pennsylvania with a current status of withdrawn.

2.6 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMartinsburg
Queue IDV2-002
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity2.6 MW
StatePennsylvania
CountyBlair
Point of interconnection
Requested (queue) date2009-05-06
Proposed in-service date2010-06-30
Operational date
Withdrawn date2010-02-08
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.