The interXdata warehouse tracks 19 interconnection projects in Blair, Pennsylvania, representing 630 MW of requested capacity.
19Total projects
1Active
6Operational
12Withdrawn
630 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 7 | 469 MW |
| Solar | 7 | 133 MW |
| Battery | 2 | 20 MW |
| Gas | 3 | 8 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Claysburg 115kV | Q56 | Wind | 180.0 MW | withdrawn | Blair, Pennsylvania |
| Sandy Ridge Wind 2, LLC | 65741_SRW2 | Wind | 87.6 MW | operational | Blair, Pennsylvania |
| Altoona-Raystown 230 kV | AE2-264 | Solar | 80.0 MW | withdrawn | Blair, Pennsylvania |
| North Allegheny Windpower Project | 56651_1 | Wind | 75.0 MW | operational | Blair, Pennsylvania |
| Sandy Ridge Wind Farm | 57285_1 | Wind | 50.0 MW | operational | Blair, Pennsylvania |
| Chestnut Flats Wind Farm | 57268_1 | Wind | 38.0 MW | operational | Blair, Pennsylvania |
| Summit-West Fall 115kV | Q53 | Wind | 38.0 MW | operational | Blair, Pennsylvania |
| Claysburg-Puzzletown 46 kV | AG1-280 | Solar | 20.0 MW | withdrawn | Blair, Pennsylvania |
| Thirty First Street 115kV | AA1-115 | Battery | 20.0 MW | withdrawn | Blair, Pennsylvania |
| Claysburg-HCR Tap 46 kV | AG1-281 | Solar | 20.0 MW | active | Blair, Pennsylvania |
| East Altoona-Pinecroft 12.47 kV | AF2-087 | Solar | 7.2 MW | withdrawn | Blair, Pennsylvania |
| Martinsburg | W3-040 | Gas | 3.8 MW | withdrawn | Blair, Pennsylvania |
| Bernville 13.2 kV | AF2-272 | Solar | 3.0 MW | withdrawn | Blair, Pennsylvania |
| Pemberton-Sinking Valley 12.47 kV | AF2-271 | Solar | 3.0 MW | withdrawn | Blair, Pennsylvania |
| Martinsburg | V2-002 | Gas | 2.6 MW | withdrawn | Blair, Pennsylvania |
| Juniata Locomotive Shop | 10302_GEN3 | Gas | 1.5 MW | operational | Blair, Pennsylvania |
| Summit-West Fall 115kV II | AI2-055 | Wind | 0.0 MW | withdrawn | Blair, Pennsylvania |
| Altoona-Raystown 230 kV II | AG2-097 | Battery | 0.0 MW | withdrawn | Blair, Pennsylvania |
| Altoona-Raystown 230 kV III | AI2-380 | Solar | 0.0 MW | withdrawn | Blair, Pennsylvania |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Blair County.
Start tracking with interXdata