Masked (898595)

Masked is a 60.0 MW solar interconnection project in Richmond, North Carolina with a current status of withdrawn. It is proposed to connect at ROCKINGHAM - WEST END 230KV EAST.

60.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID898595
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity60.0 MW
StateNorth Carolina
CountyRichmond
Point of interconnectionROCKINGHAM - WEST END 230KV EAST
Requested (queue) date2023-06-28
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata