Masked (899005)

Masked is a 199.9 MW battery interconnection project in Wake, North Carolina with a current status of withdrawn. It is proposed to connect at HARRIS PLANT - RTP 230KV.

199.9 MWCapacity
WithdrawnStatus
NCMarket
BatteryTechnology

Project facts

Canonical nameMasked
Queue ID899005
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologyBattery
Capacity199.9 MW
StateNorth Carolina
CountyWake
Point of interconnectionHARRIS PLANT - RTP 230KV
Requested (queue) date2023-06-28
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.