Masked is a 140.0 MW solar interconnection project in Cumberland, North Carolina with a current status of withdrawn. It is proposed to connect at ERWIN - FAYETTEVILLE EAST 230KV - RALEIGH.

140.0 MWCapacity
WithdrawnStatus
NCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID983734
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologySolar
Capacity140.0 MW
StateNorth Carolina
CountyCumberland
Point of interconnectionERWIN - FAYETTEVILLE EAST 230KV - RALEIGH
Requested (queue) date2025-09-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata