Masroor Storage (23INR0422)

Masroor Storage is a 203.0 MW other interconnection project in Fannin, Texas with a current status of suspended. It is proposed to connect at Bus #1760 Bonham 138kV.

203.0 MWCapacity
SuspendedStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMasroor Storage
Queue ID23INR0422
Statussuspended
Source statussuspended
MarketERCOT
TechnologyOther
Capacity203.0 MW
StateTexas
CountyFannin
Point of interconnectionBus #1760 Bonham 138kV
Requested (queue) date2021-11-15
Proposed in-service date2025-06-26
Operational date
Withdrawn date
DeveloperMasroor Energy Storage LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata