Matagorda Solar (22INR0342)

Matagorda Solar is a 101.0 MW solar interconnection project in Matagorda, Texas with a current status of operational. It is proposed to connect at 5555 Shropshire 69kV .

101.0 MWCapacity
OperationalStatus
MatagordaMarket
SolarTechnology

Project facts

Canonical nameMatagorda Solar
Queue ID22INR0342
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketMatagorda
TechnologySolar
Capacity101.0 MW
StateTexas
CountyMatagorda
Point of interconnection5555 Shropshire 69kV
Requested (queue) date2020-05-01
Proposed in-service date
Operational date2027-08-25
Withdrawn date
DeveloperMatagorda Solar Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.