Maverick Clean Energy Center (BESS) (69456_MABA1)

Maverick Clean Energy Center (BESS) is a 12.0 MW battery interconnection project in Brazoria, Texas with a current status of operational.

12.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameMaverick Clean Energy Center (BESS)
Queue ID69456_MABA1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity12.0 MW
StateTexas
CountyBrazoria
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-06-01
Withdrawn date—
Developer—
Utility / transmission ownerOn Energy Storage

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata