On Energy Storage — Interconnection Queue Projects
On Energy Storage is associated with 11 tracked interconnection projects representing 119 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
11Projects
4Active
7Operational
0Withdrawn
119 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 11 | 119 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 11 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Crosby Clean Energy Center (BESS) | 69454_CRBA1 | Battery | 12.0 MW | operational | Harris, Texas |
| Spencer Clean Energy Center (BESS) | 69459_SPBA1 | Battery | 12.0 MW | operational | Harris, Texas |
| Maverick Clean Energy Center (BESS) | 69456_MABA1 | Battery | 12.0 MW | operational | Brazoria, Texas |
| Winmil Clean Energy Center (BESS) | 69460_WIBA1 | Battery | 12.0 MW | operational | Brazoria, Texas |
| Fort Stockton Clean Energy Center (BESS) | 69455_FSBA1 | Battery | 10.1 MW | operational | Pecos, Texas |
| North Pecos Clean Energy Center (BESS) | 69458_NPBA1 | Battery | 10.1 MW | operational | Reeves, Texas |
| Columbus Clean Energy Center (BESS) | 69865_CLBA1 | Battery | 10.1 MW | active | Colorado, Texas |
| Mesquite Clean Energy Center (BESS) | 69457_MEBA1 | Battery | 10.1 MW | active | Cameron, Texas |
| Alamo Clean Energy Center (BESS) | 69453_ALBA1 | Battery | 10.1 MW | operational | Pecos, Texas |
| Colorado Clean Energy Center (BESS) | 69864_COBA1 | Battery | 10.1 MW | active | Colorado, Texas |
| Matagorda Clean Energy Center (BESS) | 69866_MGBA1 | Battery | 10.1 MW | active | Matagorda, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through On Energy Storage.