Maximino Road BESS (28INR0346)

Maximino Road BESS is a 206.0 MW battery interconnection project in Comal, Texas with a current status of active. It is proposed to connect at 7170 BERGHEIM 138kV.

206.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameMaximino Road BESS
Queue ID28INR0346
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity206.0 MW
StateTexas
CountyComal
Point of interconnection7170 BERGHEIM 138kV
Requested (queue) date2025-03-24
Proposed in-service date2028-05-31
Operational date
Withdrawn date
DeveloperHorizon Energy LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata