McConnellsburg-Texas Eastern 6 138kV (AC1-217)

McConnellsburg-Texas Eastern 6 138kV is a 55.0 MW solar interconnection project in Franklin, Pennsylvania with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMcConnellsburg-Texas Eastern 6 138kV
Queue IDAC1-217
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity55.0 MW
StatePennsylvania
CountyFranklin
Point of interconnection—
Requested (queue) date2016-10-31
Proposed in-service date2018-06-30
Operational date—
Withdrawn date2017-11-29
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.