MCLB Biosteam to Energy (69745_8100)

MCLB Biosteam to Energy is a 8.5 MW other interconnection project in Dougherty, Georgia with a current status of operational.

8.5 MWCapacity
OperationalStatus
SOCOMarket
OtherTechnology

Project facts

Canonical nameMCLB Biosteam to Energy
Queue ID69745_8100
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyOther
Capacity8.5 MW
StateGeorgia
CountyDougherty
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2001-01-01
Withdrawn date
Developer
Utility / transmission ownerInst and Envir Div Marine Logistics Base

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata