Inst and Envir Div Marine Logistics Base — Interconnection Queue Projects

Inst and Envir Div Marine Logistics Base is associated with 3 tracked interconnection projects representing 12 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
3Operational
0Withdrawn
12 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other18 MW
Gas24 MW

Geographic footprint

StateProjects
Georgia3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MCLB Biosteam to Energy69745_8100Other8.5 MWoperationalDougherty, Georgia
MCLB Landfill Gas to Energy59335_GEN2Gas2.1 MWoperationalDougherty, Georgia
MCLB Landfill Gas to Energy59335_GEN1Gas1.9 MWoperationalDougherty, Georgia

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Inst and Envir Div Marine Logistics Base.