Inst and Envir Div Marine Logistics Base — Interconnection Queue Projects
Inst and Envir Div Marine Logistics Base is associated with 3 tracked interconnection projects representing 12 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
0Active
3Operational
0Withdrawn
12 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 1 | 8 MW |
| Gas | 2 | 4 MW |
Geographic footprint
| State | Projects |
|---|---|
| Georgia | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MCLB Biosteam to Energy | 69745_8100 | Other | 8.5 MW | operational | Dougherty, Georgia |
| MCLB Landfill Gas to Energy | 59335_GEN2 | Gas | 2.1 MW | operational | Dougherty, Georgia |
| MCLB Landfill Gas to Energy | 59335_GEN1 | Gas | 1.9 MW | operational | Dougherty, Georgia |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Inst and Envir Div Marine Logistics Base.
Start tracking with interXdata