McMurtre Storage is a 176.1 MW other interconnection project in Hunt, Texas with a current status of operational. It is proposed to connect at tap 138kV 1819 Commerce South - 1815 Cumby Tap.
176.1 MWCapacity
OperationalStatus
HuntMarket
OtherTechnology
Project facts
| Canonical name | McMurtre Storage |
|---|---|
| Queue ID | 25INR0371 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Hunt |
| Technology | Other |
| Capacity | 176.1 MW |
| State | Texas |
| County | Hunt |
| Point of interconnection | tap 138kV 1819 Commerce South - 1815 Cumby Tap |
| Requested (queue) date | 2023-03-13 |
| Proposed in-service date | — |
| Operational date | 2027-12-31 |
| Withdrawn date | — |
| Developer | BT McMurtre Storage, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | developer | — | BT McMurtre Storage, LLC | low |
| 2026-09-30 | poi_name | — | tap 138kV 1819 Commerce South - 1815 Cumby Tap | low |
| 2026-09-30 | phase | — | SS Completed, FIS Completed, IA | low |
| 2026-09-30 | ia_signed_date | — | 2025-09-17 | medium |
| 2026-09-30 | operational_date | — | 2027-12-31 | medium |
| 2026-09-30 | status | suspended | operational | high |
| 2026-07-31 | new_project | — | suspended | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata