McVeytown-Strodes Mill 46 kV (AF2-147)

McVeytown-Strodes Mill 46 kV is a 13.1 MW solar interconnection project in Mifflin, Pennsylvania with a current status of withdrawn.

13.1 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMcVeytown-Strodes Mill 46 kV
Queue IDAF2-147
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity13.1 MW
StatePennsylvania
CountyMifflin
Point of interconnection—
Requested (queue) date2020-03-12
Proposed in-service date2023-09-01
Operational date—
Withdrawn date2020-08-23
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata