Mifflin County, Pennsylvania — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Mifflin, Pennsylvania, representing 886 MW of requested capacity.

9Total projects
0Active
0Operational
9Withdrawn
886 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas1464 MW
Wind4381 MW
Solar441 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
AlbrightZ1-047Gas464.0 MWwithdrawnMifflin, Pennsylvania
Raystown-Lewistown 230kVY2-087Wind150.4 MWwithdrawnMifflin, Pennsylvania
Mifflin CountyS44Wind110.0 MWwithdrawnMifflin, Pennsylvania
Lewistown 230kVX1-018Wind75.0 MWwithdrawnMifflin, Pennsylvania
Belleville/New Holland-Logan 46kVZ1-042Wind46.0 MWwithdrawnMifflin, Pennsylvania
McVeytown-Strodes Mill 46 kVAF2-147Solar13.1 MWwithdrawnMifflin, Pennsylvania
Montgomery Avenue 12.47kVV4-077Solar13.0 MWwithdrawnMifflin, Pennsylvania
Belleville 46 kVAH1-445Solar10.0 MWwithdrawnMifflin, Pennsylvania
Belleville 12.47 kVAF2-231Solar5.0 MWwithdrawnMifflin, Pennsylvania

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Mifflin County.

Start tracking with interXdata