Meadow Brook-Strasburg 138 kV (AD1-155)

Meadow Brook-Strasburg 138 kV is a 75.0 MW solar interconnection project in Frederick, Virginia with a current status of operational.

75.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMeadow Brook-Strasburg 138 kV
Queue IDAD1-155
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity75.0 MW
StateVirginia
CountyFrederick
Point of interconnection
Requested (queue) date2017-10-02
Proposed in-service date
Operational date2024-06-30
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata