Meadow Park BESS (26INR0699)
Meadow Park BESS is a 9.9 MW battery interconnection project in Tarrant, Texas with a current status of active. It is proposed to connect at Station Name: Meadow Park | Oncor 5-digit code: MDWPK | Oncor XFMR Number: 2 | ERCOT Bus Name: MEADPRK1_8 | ERCOT Bus#: 2039 | ERCOT Load Name: LDLXFMR2 | Substation Transmission kV: 138 kV | ERCOT Node#: CN1.
Project facts
| Canonical name | Meadow Park BESS |
|---|---|
| Queue ID | 26INR0699 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Tarrant |
| Point of interconnection | Station Name: Meadow Park | Oncor 5-digit code: MDWPK | Oncor XFMR Number: 2 | ERCOT Bus Name: MEADPRK1_8 | ERCOT Bus#: 2039 | ERCOT Load Name: LDLXFMR2 | Substation Transmission kV: 138 kV | ERCOT Node#: CN1 |
| Requested (queue) date | 2025-06-19 |
| Proposed in-service date | 2026-02-10 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Meadow Park ESS Assets, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata